HomeOASISGeneration Interconnection Procedures

Generation Interconnection Procedures

The following procedures, agreements and forms are required to initiate the various interconnection studies and processes required through NSP's Generator Interconnection Procedures. All completed forms should be sent to:

Nova Scotia Power Inc.
5 Long Lake Drive
Halifax, NS, Canada
B3S 1N8
Attention: John Charlton, Sr. Engineer, Interconnection.

John can be reached at: (902) 428-3000  X 5416

Transmission Interconnection Procedures (Applicable to transmission systems 69,000 volts and higher)

Interconnection Request Queue

Distribution Generator Interconnection Procedures (Applicable to distribution systems 26,400 volts and lower) - Effective July 8, 2011