Generation Interconnection Procedures

Notice of UARB Approval of Revised GIP

The following procedures, agreements and forms are required to initiate the various interconnection studies and processes required through NSP's Generator Interconnection Procedures. All completed forms should be sent to:

Nova Scotia Power Inc.
5 Long Lake Drive
Halifax, NS, Canada
B3S 1N8
Attention: John Charlton, Sr. Engineer, Interconnection.

John can be reached at: (902) 428-3000  X 5416

Transmission Interconnection Procedures (Applicable to transmission systems 69,000 volts and higher.)

Revised GIP QueueOn Sept. 24, the UARB issued its decision (PDF) on NSPI's request for amendments to the GIP. The resulting amended priority GIP queue is listed below:

Distribution Interconnection Procedures (Applicable to distribution systems 25,000 volts and lower)

Wholesale Market Calendar

DateEvent
Feb 28 Annual generation output published on OASIS
Apr 3018 Month Forecast & Assessment update published on OASIS
Jun 3010 Year System Plan posted on OASIS
Oct 3118 Month Forecast & Assessment update Published on OASIS
Nov 3MP-09 Annual Outage Planning:
Preliminary transmission system outage plan posted on OASIS
Nov 18MP-09 Annual Outage Planning:
Generation Market Participants' preferred plans due to NSPSO
Customer impact review of transmission outage plan due to NSPSO
Nov 30MP-09 Annual Outage Planning:
NSPSO initial review and feedback due to Transmitter and Generation Market Participants
Dec 17

MP-09 Annual Outage Planning:
Transmitter and Generation Market Participants' revisions to outage plans due to NSPSO

Dec 30

MP-09 Annual Outage Planning:
NSPSO notifications of approval or rejection of annual outage plan due to Transmitter and Generation  Market Participants.