Notice of UARB Approval of Revised GIP
The following procedures, agreements and forms are required to initiate the various interconnection studies and processes required through NSP's Generator Interconnection Procedures. All completed forms should be sent to:
Nova Scotia Power Inc.
5 Long Lake Drive
Halifax, NS, Canada
B3S 1N8
Attention: John Charlton, Sr. Engineer, Interconnection.
John can be reached at: (902) 428-3000 X 5416
On Sept. 24, the UARB issued its decision (PDF) on NSPI's request for amendments to the GIP. The resulting amended priority GIP queue is listed below: