Generation Interconnection Procedures

Notice of UARB Approval of Revised GIP

The following procedures, agreements and forms are required to initiate the various interconnection studies and processes required through NSP's Generator Interconnection Procedures. All completed forms should be sent to:

Nova Scotia Power Inc.
5 Long Lake Drive
Halifax, NS, Canada
B3S 1N8
Attention: John Charlton, Sr. Engineer, Interconnection.

John can be reached at: (902) 428-3000  X 5416

Transmission Interconnection Procedures (Applicable to transmission systems 69,000 volts and higher.)

Revised GIP QueueOn Sept. 24, the UARB issued its decision (PDF) on NSPI's request for amendments to the GIP. The resulting amended priority GIP queue is listed below:

Distribution Interconnection Procedures (Applicable to distribution systems 25,000 volts and lower)