Notice of UARB Approval of Revised GIP
The following procedures, agreements and forms are required to
initiate the various interconnection studies and processes required
through NSP's Revised Generator Interconnection Procedures. All completed forms
should be sent to:
Nova Scotia Power Inc.
5
Long Lake Drive
Halifax, NS, Canada
B3S 1N8
Attention: John Charlton, Sr. Engineer, Interconnection.
John can be reached
at: (902) 428-3000 X 5416